Pass4itsure > The Open Group > The Open Group Certifications > OG0-092 > OG0-092 Online Practice Questions and Answers

OG0-092 Online Practice Questions and Answers

Questions 4

Scenario: Florian Flowers BV

Please read this scenario prior to answering the question

Florian Flowers BV is an international agricultural company exporting flowers and seeds worldwide. Florian

is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60

countries worldwide. Several of these centers include administrative, manufacturing, and research

facilities.

To achieve full integration of their research capabilities with their development centers located in various

climate zones, Florian wants to develop strong self-directed teams in each location. Florian also wants to

define new business models that are profitable while reducing their impact on the environment. Florian

management is deeply committed to ensuring that the company is a world leader in socially responsible

seed development with a business strategy that focuses on profitability through environmentally friendly

operating processes.

Florians international operations are subject to various legal and regulatory requirements. In areas such as

genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently

a competitor was heavily fined for violating the regulations in a country where it was developing pest-

resistant seeds.

The Governing Board is concerned, and as a result has approved the expenditure of resources to

establish an Enterprise Architecture program. They have requested to be informed about the status of

projects that could impact regulatory compliance. They also want to enable the corporate legal staff and

auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given

location. In addition, the research organization should be able to see that the architecture is appropriate for

its needs.

TOGAF 9 has been mandated as the guiding framework for the development and evolution of the

Enterprise Architecture practice.

Refer to the Florian Flowers BV Scenario

Florian management has engaged you as the Lead Consultant to assess the current situation.

You have been asked to recommend an approach that would enable the development of an architecture

that addresses the needs of all these parties.

Based on TOGAF 9, which of the following is the best answer?

A. Depending on the nature of the architecture, a set of models should be created that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should be able to view the models to see that their concerns have been properly addressed.

B. Each architecture activity should be developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been accessed.

C. For those groups that have sufficient power and level of interest, a special report should be created that summarizes the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders' requirements.

D. It would be beneficial to develop a stakeholder map that allows the architects to define groups of stakeholders that share common concerns. A set of views should be defined that addresses the concerns each group. Architecture models can then be created for each view to address the stakeholders' concerns.

Buy Now
Questions 5

Scenario:

Please read this scenario prior to answering the Question You are serving as the Lead Architect for the enterprise architecture team at the prime contractor for the Dreadnought Unmanned Aircraft System program.

Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The decision has been made to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.

TOGAF 9 Is used for internal Enterprise Architecture activities, with an iterative approach for executing Architecture Development Method (ADM) projects.

At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving existing processes or systems.

The architect-re development project has put in place Its Architecture Capability for this project and has started a number of iteration cycles to develop the Architecture. Some tasks to address concerns related to the Business Architecture have been completed. The next immediate task is to address the Information Systems Architectures. The Information Systems Architectures must address stakeholder concerns such as:

1.

Which procurement-related business processes are supported by zero, one, or many existing applications?

2.

What non-procurement applications will need to be integrated with any new procurement applications?

3.

What data will need to be shared?

Refer to the Scenario

[Note: You may need to refer to TOGAF 9 Chapter 35 in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams for this situation.

Based on TOGAF 9, which of the following is the best answer?

A. in the early iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and describe the Baseline Data Architecture using a Data Entity/Data Component catalog. In the later Iterations of the Architecture Definition, you would describe the Target Application Architecture using Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a System/Data matrix.

B. In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a System/Data matrix. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix, and describe the Baseline Data Architecture with a Data Entity/Data Component catalog.

C. In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matrix. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and describe the Baseline Data Architecture with a Data Entity/Data Component catalog.

D. In the early iterations of Architecture development, you would describe the Baseline Application Architecture with a Technology Portfolio catalog, and describe the Baseline Data Architecture with a Data diagram. In the later iterations of Architecture development, you would describe the Target Application Architecture with a System/Technology matrix, and describe the Target Data Architecture with a Data Dissemination diagram.

Buy Now
Questions 6

Scenario: Please read this scenario prior to answering the question You are the Lead Enterprise Architect in a company that specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. The company has manufacturing facilities located in Illinois, Nebraska, and Manitoba. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturer's design specifications.

Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and improved blade longevity. The company has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.

The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

TOGAF 9 and its Architecture Development Method (ADM) are used to develop the automated

manufacturing processes and systems that are used to design, manufacture, and test the blade

assemblies.

Recently, a pilot architecture project was completed at a single location that defined a standard approach

for controlling the Automated Test System that is used at each plant to perform final quality assurance

tests on each completed blade assembly. The Architecture Board approved the plan for immediate

implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement and deploy the new

Automated Test System controller for each location. The Chief Engineer, sponsor of the activity, has

expressed concern that a uniform process be employed at each location to ensure consistency.

Refer to the Scenario

You have been asked to recommend the best approach to address the Chief Engineer's concern.

Based on TOGAF 9, which of the following is the best answer?

A. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract. You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

B. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

C. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization. You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.

D. You use the issued Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of the completed blade assembly at each location and develop change requirements if necessary. You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.

Buy Now
Questions 7

Carter Woods, a global furniture firm, wants to improve the efficiency of its sales force by replacing their

legacy configuration and ordering systems based on manual and paper based processes with an online

ordering platform.

Carter Woods uses the Architecture Delivery Method from TOGAF 9. The CIO sponsored this activity and

the Baseline Architecture was defined on the initial iteration defining: approach, scope and architectural

vision including a set of architecture principles related to the Data domain:

Data is an asset.

Data is shared.

Data is accessible.

A set of aspects to clarify arose from the business analysis from the assumption to replace the legacy

systems with an online centralized one. These main concerns are:

To identify the changes to existing business processes.

To identify the data entities that can be shared among the sales agents.

To clarify how to keep the data secured.

To identify the list of non-sales application to be integrated with the sales applications

Refer to the scenario above

You, as Lead Enterprise Architect, need to identify the most appropriate architecture viewpoints to address

the concerns above mentioned.

Choose one of the following answers

A. Depict the Business Architecture using a Role catalog and a Process/Event/Control/Product catalog. Depict the Data Architecture using a System/Data matrix, a Data Entity/Data Component catalog and Data Security diagram. Depict the Application Architecture using an Interface catalog. Define the Technology Architecture via a Network Computing/Hardware diagram.

B. Depict the Business Architecture using a Business Interaction matrix and a Location catalog. Depict the Data Architecture using a Data Lifecycle diagram and a Data Migration diagram. Depict the Application Architecture using a Software Engineering diagram. Depict the Technology Architecture using a Communications Engineering diagram.

C. Depict the Business Architecture using a Business Footprint diagram and a Location catalog. Depict the Data Architecture using a Data Migration diagram, System/Data matrix and Data Lifecycle diagram. Depict the Application Architecture using an Application Communication diagram. Depict the Technology Architecture using a Network Computing/Hardware diagram.

D. Depict the Business Architecture using a Role catalog and Location catalog. Depict the Data Architecture using a System/Data matrix, Data Entity/Business Function matrix and Data Security diagram. Depict the Application Architecture using an Application Interaction matrix. Define the Technology Architecture via a Network Computing/Hardware diagram.

Buy Now
Questions 8

Chiamin Metals is a leading world-wide manufacturer for continuous casting and bottom pouring powders. In addition to mould powders, the company also produces cored wire for secondary metallurgy. Chiamin Metals offers a variety of products and uses a paper-based catalog to sponsor them. A new CIO has joint the enterprise and has set up a team of Enterprise Architects following the TOGAF 9 practice. The main challenge is now to offer to Chiamin Metals customers a centralized and reliable entry point for their request via the implementation of a global online portal. This will allow the management of new marketing activities and will enable the new Chiamin Metals' ecommerce service. Refer to the scenario above You are the Chief Architect and the CIO asked you to present an Architecture Vision to address the above business problem. Identify the best answer accordingly to the TOGAF 9. Choose one of the following answers

A. You identify key stakeholders, their concerns, and define the key business requirements to be addressed in the architecture engagement and generate a Stakeholder Map. You Evaluate business capabilities and execute a Business Transformation Readiness Assessment. You apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.

B. As requested by the CIO you focus on the Architecture Vision documentation and apply the Business Scenarios technique to create a high-level view of the Baseline and Target Architectures also based on the stakeholder concerns, business capability requirements, scope, constraints, and principles.

C. You create a high-level view of the Target Architectures and then present them to the CIO.

D. As requested by the CIO you focus on the Architecture Vision and create a detailed view of the Baseline Architectures. This is done for Business, Data, Application and Technology domains and then presented to the CIO using the Architecture Definition Document.

Buy Now
Questions 9

Scenario Please read this scenario prior to answering the question Your role is consultant to the Lead Architect within a multinational semiconductor and software design company. Its largest business is in processors, although it also designs system-on-a-chip infrastructure and manufactures memory chips. A characteristic feature of its processors is their low electric power consumption, which makes them particularly suitable for use in portable devices. As well as licensing its technology, the company has several manufacturing divisions.

The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve its ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment. They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.

Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.

Refer to the Scenario You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on TOGAF, which of the following is the best answer?

A. You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list tine projects. They should then document the lessons learned and generate the final Implementation and Migration Plan.

B. You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.

C. You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/ project management and operations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and Migration Plan.

D. You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.

Buy Now
Questions 10

Scenario Please read this scenario prior to answering the question You are serving as the Lead Architect for the enterprise architecture team at a large multinational aerospace and defense company. The company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. Several procurement processes have had problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant procurement processes and systems. The company will move to a "Just-in-time" procurement system so as to keep inventory costs low.

TOGAF 9 is used for internal Enterprise Architecture activities. This project is using an iterative approach for executing the Architecture Development Method (ADM).

At present, there are no particularly useful architectural assets in the Architecture Repository that are related to this initiative. All assets will need to be acquired, customized, or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing procurement processes or systems.

The architecture development project has completed the Preliminary Phase and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business and Application Architectures. Key stakeholder concerns that should be addressed by these architectures include:

1.

What groups of people should be involved in procurement-related business processes?

2.

What are the overall lifetimes of the Request for Proposal and Purchase Order business objects?

3.

What non-procurement applications will need to be integrated with any new procurement applications?

Refer to the Scenario

[Note: You may need to refer to Chapter 35 of the reference text in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next

iteration of Architecture development.

Based on TOGAF, which of the following is the best answer?

A. In the next iteration of Architecture development, you would describe the Baseline Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog, and a Data Entity/Business Function matrix. You would describe the Baseline Application Architecture with an Application/Function matrix.

B. In the next iteration of Architecture development, you would describe the Target Business Architecture with a Business ServiceFunction catalog, an Organization/Actor catalog, and Data Lifecycle diagrams. You would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix.

C. In the next iteration of Architecture development, you would describe the Target Business Architecture with a Business ServiceFunction catalog, a Business Interaction matrix, and Product Lifecycle diagrams. You would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix.

D. In the next iteration of Architecture development, you would describe the Baseline Business Architecture with a Baseline Business Process catalog, and an Object lifecycle catalog. You would describe the Baseline Application Architecture with a Technology Portfolio catalog.

Buy Now
Questions 11

Scenario Please read this scenario prior to answering the question You are serving as the Lead Architect for an insurance company, which has been formed through the merger of three previously independent companies. The company now consists of three divisions with the same names and division headquarters as their predecessors.

The lack of integration between the three divisions has increasingly caused problems in the handling of customer and financial information. The inability to share information has resulted in lost opportunities to

"leverage the synergies" that had been intended when the company was formed. At present, each division

maintains its own applications. Despite an earlier initiative to install a common application to manage

customer, products, and claims information, each division has different ways of defining these core

elements and has customized the common application to the point where the ability to exchange

information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a common web portal, contact center

software suite, and document management system. Also the company has selected a single enterprise-

wide customer relationship management (CRM) application to consolidate information from several

applications that exist across the divisions. The application will be used by each of the divisions and

accessed by third party partners through well defined interfaces.

The Corporate Board is concerned that the new application must be able to manage and safeguard

confidential customer information in a secure manner that meets or exceeds the legal requirements of the

countries in which the company operates. This will be an increasingly important capability as the company

expands its online services in cooperation with its partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is

to coordinate efforts between the implementation team and the migration teams in each division. The CIO

has also formed a cross- functional Architecture Board to oversee and govern the architecture. The

company has an existing team of security architects. TOGAF 9 has been selected as the core framework

for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of

top management.

Refer to the Scenario

In the Preliminary Phase you need to define suitable policies and ensure that the company has the

appropriate capability to address the concerns of the Corporate Board.

Based on TOGAF, which of the following is the best answer?

A. You evaluate the implications of the concerns raised by the Corporate Board in terms of regulatory requirements and their impact on business goals and objectives. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the concerns. You allocate a security architect to oversee the implementation of the new application that is being developed.

B. You start by clarifying the intent that the Board has for raising these concerns. This enables you to understand the implications of the concerns in terms of regulatory requirements and the potential impact on current business goals and objectives. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture and that this be considered an additional domain architecture.

C. You evaluate the implications of the Board's concerns by examining the security and regulatory impacts on business goals, business drivers and objectives. Based on your understanding, you then update the current security policy to include an emphasis on the concerns. You define architecture principles to form constraints on the architecture work to be undertaken in the project. You then allocate a security architect to ensure that security considerations are included in the architecture planning for all domains.

D. You identify and document the security and regulatory requirements for the application and the data being collected. You ensure that written policies are put in place to address the requirements, and that they are communicated across the organization, together with appropriate training for key employees. You identify constraints on the architecture and communicate those to the architecture team. You establish an agreement with the security architects defining their role within the ongoing architecture project.

Buy Now
Questions 12

Scenario Please read this scenario prior to answering the question Your role is that of Lead Enterprise Architect within the headquarters of a large fast food chain. The chain manages over 6000 restaurants across 24 countries. Each restaurant in the chain is an independently owned and operated franchise. Many of the restaurants use have been with the franchise since its initial startup phase and still use the first generation IT systems deployed over 15 years ago.

The CEO of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new support services to help them complete with the increasing competition from coffee shops. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.

These changes will provide the chain with improved products, including healthier alternatives in their menu, and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

The chain has a mature enterprise architecture practice based in its headquarters and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.

Based on the recommendations from the initial study, the chain has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise.

Refer to the scenario You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision.

Based on TOGAF, which of the following is the best answer?

A. You propose that this engagement define the baseline architecture first in order to assess the current infrastructure capacity and capability. The initial priority is to understand the problem. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

B. You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

C. You propose that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

D. You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.

Buy Now
Questions 13

Please read this scenario prior to answering the question.

You have been assigned the role of Chief Enterprise Architect within a leading professional services company that specializes in providing outsourcing services. The company has over 20,000 professionals and works on some of the world's largest outsourcing projects. Outsourcing services include business processes, infrastructure, and service management. The company also provides business consulting services. Roughly half of its turnover comes from the private sector and hal from the public sector.

With numerous service areas and a large number of diverse engagements in progress at any given time, overall engagement management within the company has become challenging. The company has recently had a number of high profile projects that have overrun on budget and under delivered, thereby damaging its reputation and adversely impacting its share price.

The company has established an Enterprise Architecture program based on the TOGAF standard, sponsored jointly by the Chief Executive Officer and Chief Information Officer. An Architecture Board has been formed comprised of IT staff executives and executives from the major service areas and consulting practice.

The Enterprise Architecture (EA) team has been working with the Strategic Planning team to create a strategic Enterprise Architecture to address these issues. The EA team has defined a framework and held workshops with key stakeholders to define a set of architecture principles to govern the architecture work. They have completed an Architecture Version at a strategic level and laid our Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period. This will include three distinct transformations.

The CIO has made it clear that prior to the approval of the detailed implementation and Migration plan, the EA team will need to assess the risks associated with the proposed architecture. He has received concerns from some of the vice presidents across the company that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the risks.

Refer to the Scenario

You have been asked to recommend an approach to satisfy these concerns.

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

A. Before preparing the detailed Implementation and Migration plan, the EA team should review and consolidate the gap analysis results from Phases B to D. This can be used to understand the transformations that are required to achieve the proposed Target Architecture. The EA team should then assess the readiness of the organization to undergo change. Once the architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.

B. The EA team should apply an interoperability analysis to evaluate any potentital issues across the architecture. This should include the development of a matrix showing the interoperability requirements. Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and the Implementation and Migration Plan.

C. The EA team should evaluate the organization's readiness to undergo change. This will allow the risks associated with the transformations to be identified and mitigated for. It will also identify improvement actions to be worked into the Implementaion and Migration Plan. The Business Value Assessment technique should then be used to detetmine the business value and associated risks for the transformation.

D. The EA team should bring together information about potential solutions from the appropriate sources. Once the target architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures. A value realization process should then be established to ensure that the concerns raised are addressed.

Buy Now
Exam Code: OG0-092
Exam Name: TOGAF 9 Part 2
Last Update: Jan 02, 2025
Questions: 75
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99