HOTSPOT
An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer's environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.
Which configuration steps must the integrator perform to provide the customer with this functionality?
A. Enable Remote Support and Insight Online Integration in the Composer UI
B. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
C. Configure OneView with iLO Amplifier pack
D. Activate iLO Federation on all installed compute nodes
Which policy can an integrator apply when creating a datastore using HPE OneView for vCenter Server?
A. Data at Rest encryption policy
B. Round Robin load balancing policy
C. Recovery Manager Central policy
D. virtual machine Restart policy
During a first-time installation of HPE Synergy, an external monitor is not available to the integrator. Which approach should the integrator take to perform the first-time setup?
A. Download MSTCS, connect the laptop to the front Panel Ethernet port, and open a RDP Session to 192.168.10.1 on port 443.
B. Download VNC Viewer, connect the laptop to the front Panel Ethernet port, and open a VNC-connection to 192.168.10.1 on port 5900.
C. Download Telnet, connect the laptop to the front Panel Ethernet port, and open a connection to 192.168.10.1 on port 8443.
D. Download PuTTY, connect the laptop to the front Panel Ethernet port, and open an SSH connection to 192.168.10.1 on any port (default is 22).
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network. Which procedure should the integrator use to address the customer's concern?
A. Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer's management network.
B. Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer's management network.
C. Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer's management network.
D. Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer's management network using two uplinks.
Which management tool required by HPE Infosight must be deployed at the customer site?
A. HPE Global Dashboard
B. HPE OneView
C. HPE iLO Amplifier
D. HPE StoreServ Management Console (SSMC)
Refer to the exhibit.
A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules. What is the maximum number of compute nodes that the customer's fabric could support?
A. 24
B. 36
C. 48
D. 60
A customer plans to deploy VMware HA cluster using the Hypervisor Cluster Profile feature of OneView. What must the customer consider when configuring the HA cluster?
A. The HA cluster can be enabled only on the nodes with vSAN enabled
B. The HA cluster must have extra computer resources available as failover capacity
C. The HA cluster can coexist with a DRS cluster if mixed CPU architecture is used
D. The HA cluster can be configured only when all nodes are exactly the same
A customer wants to expand their existing cluster using the Grow Cluster functionality from OneView for vCenter Server by Image Streamer is not available. Which OS build plan managed by HPE OneView for vCenter Server can the customer use?
A. iLO Virtual Media-Based Deployment
B. PXE-Based Deployment
C. iLO Federation-Based Deployment
D. ICsp-Based Deployment
A customer complains about the database performance running on the HPE Synergy 480 compute node. To solve that problem, an integrator has to install the maximum memory in this compute node. What else does the integrator need to do to allow the SY480 Gen10 to see all the memory modules?
A. Add a second processor
B. Install the Synergy Premium Backplane option
C. Install NVDIMM memory
D. Install a Memory Expansion Kit