Which item statuses can you select inside a material BOM? (Choose 2)
A. Service
B. Sales
C. Quality management
D. Engineering
What type of time element can be reduced by strategy settings while dispatching? (Choose 2)
A. Transportation time
B. Wait time
C. Queue time
D. Setup time
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
A. MRP type
B. MRP group
C. MRP planning file
D. MRP controller
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? (Choose 2)
A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
B. The number of leading zeros for internal numbers is client-specific.
C. In Customizing you can decide by material type whether to use the long material number.
D. The display template for material numbers applies to all clients.
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand.
Which planning strategy do you use?
A. Planning with final assembly (40)
B. Make-to-order production (20)
C. Make-to-stock production (10)
D. Planning without final assembly (50)
You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do? (Choose 2)
A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
B. Set the creation indicator for purchase requisitions on initial screen of MRP run
C. Add the agreement to the source list and mark it for MRP revalance.
D. Add the agreement to the quota arrangement and mark it for MRP revalance.
What does the material type influence? (Choose 2)
A. Which plant specific status is allowed
B. Which material master views can be maintained
C. Which document types are allowed
D. Whether the material is produced in-house, procured externally or bouth
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
A. Specify a negative offset time in the strategy profile.
B. Specify a positive planning horizon in the strategy profile.
C. Specify a negative lanning horizon in the strategy profile.
D. Specify a positive offset time in the strategy profile.
For a production version to be valid and consistent what requirements must be fulfilled? (Choose 3)
A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
B. The assigned routing must NOT have alternative sequences.
C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
D. The lot size range must be within the lot-size range of the assigned routing.
E. The assigned routing must be a rate routing.
How can you achive a feasible production plan in case of capacity constraints? (Choose 3)
A. Select an alternative mode on a resource.
B. Adjust the available capacity.
C. Reduce the planning window
D. Form optimum sequence to reduce setup times
E. Execute an infinite production planning run