What is the correct receiver object type for the settlement of arefurbishment order?
A. The fixed asset
B. The cost center
C. The material
D. The WBS element
Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.
A. The planner can change estimated costs only at header level.
B. Shop papers can only be printed after the order release.
C. Goods receipts for external services can be entered.
D. The controller can determine actual cost surcharges.
E. The planner can change planned costs at operation level.
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?
A. It is not shifted.
B. It is postponed by 5 days.
C. It is postponed by a full cycle(100%).
D. It will be 5 days earlier.
Which statement is correct about the SAP Fiori tile group? Note:There are 2 correct answers to this question.
A. It can be assigned directly to the user via personalization.
B. It is assigned via a portal role.
C. lt provides only SAPUI5-based apps.
D. Itis based on an SAP Fiori tile catalog.
Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.
A. Release. Print
B. Put in Process. Schedule
C. Release. Start Work
D. Complete. Close Report
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.
A. By assigning a PFCG role with an SAP Fiori catalog
B. By assigning a PFCG role with an SAP Fiori tile group
C. By assigning a portal role with an SAP Fiori catalog
D. By assigning the tiles directly
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?
A. Call horizon
B. Lead float
C. Scheduling period
D. Scheduling indicator
The first release of SAP asset manager mobile application is based on:
A. ios and android
B. Android only
C. Windows only
D. ios only
E. IOS,Android, Windows
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question.
A. Change the planned costs.
B. Change the settlement rule.
C. Lock or unlock the order.
D. Create an invoice receipt for delivered materials.
E. Update the estimated costs
Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question.
A. More than one operation must always be maintained in themaintenance order.
B. Notifications are used for documentation of technical findingsand activities performed.
C. Maintenance orders can be created as immediate orders without any planning.
D. Orders always need to be combined with notifications
E. Ordersand notifications can be utilized in combination