A supervisor is required to report actual work hours by work order number.
With which statuses can this be accomplished? (Choose two.)
A. INPRG
B. WAPPR
C. CANCEL
D. PNDREV
E. COMPLETE
A fixed-schedule PM needs to be set up.
What other setting need to be selected in addition to the frequency value?
A. Alert Lead (DAYS) must equal 0
B. Alert Lead (DAYS) must be greater than 0
C. Use Last Work Order's Start Date to Calculate Next Due Date? checked
D. Use Last Work Order's Start Date to Calculate Next Due Date? unchecked
Which of the following settings values will determine the number of items to be ordered during the reorder process?
A. Safety Stock
B. Reorder Point
C. Conversion Factor
D. Economic Order Quantity
What is the reason to specify asset relationships?
A. To deploy assets.
B. To design the asset infrastructure.
C. To define a logical connection between separate assets.
D. To define how assets are allowed to behave when work is performed on them.
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?
A. Create a master PM and link to the characteristic on the Related Records tab.
B. Create a condition monitoring point and specify the PM on the upper or lower limit.
C. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
D. Create an escalation based on the characteristic meter and trigger the PM via an action.
A company needs to add the unit of measures for items, tool and services.
In which application can this be done?
A. Receiving
B. Storerooms
C. Asset Templates
D. Request for Quotations
A user has created a request for quotation and sent it to vendors. After receiving the responses from the vendors, the user will need to create a purchase order.
What action must be performed before a purchase order can be created?
A. Purchase requisitions must first be created.
B. Status of the request for quotation must be APPR.
C. Request for quotation lines must be awarded to a vendor.
D. Vendor quotation receipt transactions must be completed.
A company wishes to configure Maximo so that meter readings automatically create work orders based on
condition monitoring points. The company has already configured the system in Organizational settings
and created the appropriate condition monitoring points.
What additionally needs to be configured for this be accomplish?
A. Any meter should be added to the asset and the ConditionMonWoGenCronTask should be active e
B. A continuous type meter should be added to an asset and the PMWOGenCronTask should be active.
C. A gauge type meter should be added to an asset and the MeasurePointWoGenCronTask should be active.
D. A characteristic type meter should be added to an asset and the ConditionMonWoGenCronTask should be active.
A company is using PM work orders and wants to specify the work order default status. How is this done?
A. Modify the PM WOGEN process
B. Set the option, Work Order Default Status
C. Set the Work Order Status on the PM record
D. Set the System Property, Work Order Default Status
A company wants the escalation action and notification to be applied to an expired purchase contract. Which of the following must be defined?
A. Site
B. Organization
C. Escalation Point
D. Escalation Group