Pass4itsure > IBM > IBM Certifications > C1000-031 > C1000-031 Online Practice Questions and Answers

C1000-031 Online Practice Questions and Answers

Questions 4

A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements.

How many racks units (EIA) are required?

A. 8

B. 9

C. 6

D. 10

Buy Now
Questions 5

A customer would like to deploy a new application that requires 7 day by 24 hour availability.

What advantage does the Power System E980 have versus the Power System S924 to satisfy their requirement?

A. PCIe hot plug adapters

B. Soft error protection, recovery and self-healing

C. Active Memory Mirroring

D. Chipkill memory

Buy Now
Questions 6

A customer has a 40 core Power System E980 and would like to use Mobile Capacity on Demand.

What is the minimum of static processor activations that are required?

A. 10

B. 12

C. 20

D. 8

Buy Now
Questions 7

A customer has a mission-critical IBM i application running on a POWER9 processor-based server that requires eight processor licenses. For High Availability, a POWER9 CBU server is synchronized with the production server using PowerHA for IBM i.

What is the minimum number of IBM i processor licenses required on the CBU server?

A. 2

B. 4

C. 1

D. 8

Buy Now
Questions 8

A customer wants to provide redundant links to their network switches to increase bandwidth and availability.

This technique is referred to as:

A. VLAN tagging.

B. Shared Ethernet Adapter.

C. Network Interface Backup.

D. Link aggregation.

Buy Now
Questions 9

Which of the following can be moved from a Power System 770 to a Power System E980 when doing a migration?

A. PCIe 12X I/O drawers #5802/5877

B. EXP30 SSD I/O drawer

C. EXP24S SAS Storage Enclosure

D. Memory DIMMs

Buy Now
Questions 10

A Technical Delivery Assessment (TDA), as part of the Solution Assurance is used to:

A. aggressively complete against competition.

B. resolve concerns about customer satisfaction.

C. expedite shipment of a server.

D. identify and assess risks.

Buy Now
Questions 11

A customer has older generations of Power System servers that they want to manage with their Power System E980 server from the same HMC running V9R1.910.

What is the oldest Power Systems generation that is supported with this HMC level?

A. POWER6

B. POWER7

C. POWER7+

D. POWER8

Buy Now
Questions 12

A customer wants the highest performance drives possible for booting the VIOS on their Power System E980. The solution must allow for concurrent maintenance of the drives.

Which of the following technology solutions will best satisfy their requirement?

A. SAS attached SSD

B. Fibre Channel attached SSD

C. Internal NVMe

D. Internal HDD on a split backplane

Buy Now
Questions 13

An IBM Business Partner is installing two systems in two locations for a Disaster Recovery (DR) solution.

Which of the following is the most efficient way to set up production systems for DR of the LPARs operating system disks?

A. Boot OS from internal disks using NPIV.

B. Boot VIOS from SAN and LPAR OS boot from internal disks using NPIV.

C. Boot LPAR OS from internal disks using vSCSI.

D. Boot LPARs from SAN using NPIV.

Buy Now
Exam Code: C1000-031
Exam Name: IBM Power Systems Scale-Up Technical Sales
Last Update: Jan 11, 2025
Questions: 101
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99