Pass4itsure > Microsoft > Specialty > AZ-120 > AZ-120 Online Practice Questions and Answers

AZ-120 Online Practice Questions and Answers

Questions 4

Litware is evaluating whether to add high availability after the migration What should you recommend to meet the technical requirements?

A. SAP HANA system replication and Azure Availability Sets

B. Azure virtual machine auto-restart with SAP HANA service auto-restart.

C. Azure Site Recovery

Buy Now
Questions 5

You plan to migrate an SAP HANA instance to Azure.

You need to gather CPU metrics from the last 24 hours from the instance.

Solution: You use DBA Cockpit from SAP GUI.

Does this meet the goal?

A. Yes

B. No

Buy Now
Questions 6

You plan to deploy an SAP production landscape that uses SAP HANA databases on Azure.

You need to configure the storage infrastructure to support the SAP HANA deployment

The solution must meet the SAP issued requirements for data throughput and I/O.

How should you configure the storage?

A. RAID1

B. RAID5

C. RAID0

D. RAID6

Buy Now
Questions 7

You have an SAP production landscape that uses SAP HANA databases on Azure. The HANA database server is a Standard.M32ms Azure virtual machine that has 864 GB of RAM.

The HANA database is 400 GB. You expect the database to grow by 40 percent during the next 12 months.

You resize the HANA database server virtual machine to Standard_m64ms and ,024 GB of RAM.

You need to recommend additional changes to minimize performance degradation caused by database growth

What should you recommend for the HANA database server?

A. Increase the number of vCPUs.

B. Configure additional disks

C. Add a secondary network interface.

D. Add a scale out node.

Buy Now
Questions 8

You migrate an on-premises instance of SAP NANA that runs SUSE Linux Enterpnse Server (SLES) to an Azure virtual machine.

You project that in two years, you will replace the virtual machine with a larger virtual machine within the same flexibility group.

You need to recommend solutions to minimize HANA deployment costs during the next three years. The solutions must not affect the availability SLAs.

Which two solutions should you recommend? Each correct answer presents a complete solution

NOTE: Each correct selection is worth one point.

A. a three-year reservation that has instance size flexibility

B. a one-year reservation that has instance size flexibility

C. a one-year reservation that has capacity priority

D. Azure Hybrid Benefit

E. Azure Spot instance

Buy Now
Questions 9

HOTSPOT

You plan to deploy a highly available ASCS instance to SUSE Linux Enterprise Server (SLES) virtual machines in Azure.

You are configuring an internal Azure Standard Load Balancer for the ASCS instance.

How should you configure the internal Standard Load Balancer? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 10

HOTSPOT

You have an Azure alert rule and action group as shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic. NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 11

HOTSPOT

For each of the following statements, select Yes if the statement is true. Otherwise, select No.

NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 12

HOTSPOT

You have an Azure virtual machine named VM1 that hosts an SAP application server.

You need to implement snoozing for VM1. The solution must meet the following requirements:

Minimize compute costs for VM1.

Gracefully terminate the SAP application.

What should you do? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 13

DRAG DROP

You have an Azure subscription.

You plan to deploy a SAP NetWeaver landscape that will use SQL Server on Azure virtual machines. The solution must meet the following requirements:

1.

The SAP application and database tiers must reside in the same Azure zone.

2.

The application tier in the Azure virtual machines must belong to the same Availability Set.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Select and Place:

Buy Now
Exam Code: AZ-120
Exam Name: Planning and Administering Microsoft Azure for SAP Workloads
Last Update: Dec 21, 2024
Questions: 218
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99