Customer Requirements:

You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization wants three defined virtual machine performance levels:

-Gold Tier -High workload VMs

-Silver Tier -Medium workload VMs

-Bronze Tier -Development workload VMs

The organization has eight ESXi hosts that can be used in the design. Five of the hosts are older "medium performance" hosts, while the last 3 are newer "high performance" hosts that provide better resources when compared to the other hosts. The organization has provided a list of requirements that the design must meet:

-

Gold Tier virtual machines should run only on high performance servers, unless no high performance servers are available. They should also be allocated 75% of overall available resources regardless of placement.

-

Silver Tier virtual machines should run only on medium performance servers, unless no medium performance servers are available. They should also be allocated 25% of overall available resources regardless of placement.

-

Bronze Tier virtual machines should run only on medium performance servers. They should also receive a 35% subset of resources from those allocated to the Silver Tier.

Design Requirements:

Create a logical design that shows resource allocation and cluster policies needed to meet the customer's requirements. The design should include:

-

All required server(s)

-

All required resource(s)

Place host(s) in the required DRS group(s). Place virtual machines in the appropriate resource pool(s). Connect parent to child resource pool connector(s) where needed. Connect the appropriate affinity connector(s) where needed.

A.

Check the answer in explanation.

Buy Now
Questions 5

You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has identified a number of challenges that occur within their current infrastructure that they would like addressed in the design. For

each challenge, determine the vSphere technologies that could be used in the design.

Match each Challenge on the left by dragging the red Challenge buttons (C1-C4) over the appropriate Technology.

Select and Place:

Buy Now
Questions 6

A company has one data center site running 50 hosts and 400 virtual machines and requires a vSphere 6.5 design.

1.

The CIO wants to add a secondary site for Disaster Recovery (DR) with A hours RPO.

2.

The application developer is concerned about anticipated growth as several new projects begin.

3.

The CISO is worried about data leaks and theft.

4.

The CTO would like to buy new servers with better specifications and higher consolidation ratio.

Determine the critical requirements for each of the key stakeholders. Some requirements might have more than one stakeholder.

Select and Place:

Buy Now
Questions 7

You have been tasked with creating a vSphere 6.5 design for an organization. The organization is looking to implement a Virtual SAN into their environment. You have been tasked with determining whether a given Virtual SAN logical design

decision meets the technical requirements of their infrastructure.

For each Design Decision on the left drag the red Decision buttons (D1-D8) on the right and place it on the proper Technical Requirement.

NOTE: Not all Design Decisions will be used.

Select and Place:

Buy Now
Questions 8

You have been tasked with creating a vSphere 6.5 data center design for an organization. After interviewing key stakeholders and subject matter experts for a new implementation, it was determined that:

1.

Existing network infrastructure should be sufficient.

2.

HIPPA compliance must be maintained.

3.

Mission critical applications must be recoverable.

4.

Provide training to staff to ensure they can support the implementation.

5.

IT department capital investment has been agreed upon and approval is nearly complete.

For each statement, you must determine if the statement should be categorized as an assumption, constraint, requirement or risk. Match each Business Statement by dragging the red Statement buttons (S1-S5) over the text of the appropriate Categorization. NOTE: Statements can have more than one Categorization.

Select and Place:

Buy Now
Questions 9

A solution architect has been tasked with designing a new environment that meets the growing needs of a company, and has obtained this information:

1.

Each new server will use a single 2-port 10Gb Converged Network Adapter (CNA) for both network and storage access.

2.

The network team has replaced all network equipment with a 10Gb fabric.

3.

The new environment will host both web servers and Oracle database servers.

4.

Resources will not be overcommitUid under regular upon at ions to mitigate performance issues.

5.

The business needs a tool to understand application failures.

6.

$lmillion has been budgeted for the data center expansion project.

Based this information, which two statements are requirements for the new design? (Choose two.)

A. An Enterprise monitoring solution must be in place for Root Cause Analysis.

B. The Oracle team will ensure sufficient database performance at the application level.

C. vSphere provides the ability to overcommit resources without performance issues.

D. vCPU count must be equal or less than the physical CPU core count unless there is a failure.

Buy Now
Questions 10

A company has requested assistance with a new cross-site failover design to support business-critical applications.

1.

It has two sites when are very well-connected, and latency is less than 5ms round trip.

2.

The customer requires that its applications be restarted even in the event of a total site failure.

3.

The applications must be kept online even when migrated during maintenance.

4.

Storage arrays at either site support both synchronous and asynchronous replication.

Which two options are accurate application requirements for this scenario? (Choose two.)

A. The design must ensure continuous application uptime even during a total site failure.

B. The design must prioritize application availability.

C. The design must ensure application recoverability at the second site.

D. The applications are latency-sensitive.

Buy Now
Questions 11

A company is conducting a technology refresh and has requested assistance with a vSphere 6.5 design.

1.

The company has a corporate headquarters and two data centers strategically placed around the country, which provide the bulk of the computer power and storage for their customer-facing stores.

2.

The company requires each of its stores to be able to operate independently if connectivity is ever lost.

3.

Presently, all stores are configured differently and must be standardized as part of the technology refresh

4.

To support store operations, only a dozen applications are required.

5.

Any downtime during store hours could result in significant losses.

6.

Any proposed design must minimize cost.

What is a VMware-recommended option for this scenario?

A. VMware vSAN cluster with a minimum of three hosts

B. VMware vSphere cluster with low-cost iSCSI shared storage

C. VMware vSAN Stretched Cluster with nearest regional data center

D. VMware vSAN Remote Office Branch Office (ROBO) with two hosts

Buy Now
Questions 12

A company has a vSphere 6.5 environment with vSAN 6.5 and iSCSl storage.

1.

In the vSphere cluster, HA and DRS are enabled.

2.

The servers have multiple NIC ports and not all of them are in use.

3.

The customer wants to put additional unused NIC ports on the heartbeat network to ensure higher availability. Where should the unused NIC be placed?

A. on the vMotion network

B. on the Management network

C. on the vSAN network

D. on the iSCSI network

Buy Now
Questions 13

A customer is using a vSphere APIs for Storage Awareness (VASA) compatible storage array. The VASA provider is published as a virtual appliance. To ensure recoverability, where must the VASA prowler and vCenter server virtual machines be stored?

A. The VASA provider and vCenter Server will be placed on the standard datastore (VMFS, NFS).

B. The VASA provider and vCenter Server will be placed on the vVol datastore.

C. The vCenter Server will be placed on the vVol datastore and the VASA provider will be placed on the standard datastore (VMFS, NFS).

D. The VASA provider will be placed on the vVol datastore and the vCenter Server will be placed on the standard datastore (VMFS, NFS)

Buy Now
Exam Code: 3V0-624
Exam Name: VMware Certified Advanced Professional 6.5 – Data Center Virtualization Design Exam
Last Update: Dec 18, 2024
Questions: 142
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99