On which three entities can proration be disabled? (Choose three.)
A. Calculation Rule Business Object
B. Bill Factor
C. Calculation Rule
D. Rate Version Calculation Group
E. Rate Schedule
What happens when a device's measuring components are reconfigured (a new measuring component will be read) at a service point?
A. A device with a new configuration type is created.
B. The original installation event is updated with the "removal" (expire old device configuration).
C. A device with a new configuration type is created. Moreover, a new installation event is created to `install" (new device configuration).
D. The original installation event is updated with the "removal" (expire old device configuration) and a new installation event is created to "install" (new device configuration).
E. A new installation event is created to "install" (new device configuration).
What Service Order activity types does the application include?
A. Start Service; Stop Service; Cut for Non-Payment; Reconnect Service for Payment; Exchange Meter; Move-In/Move-Out Service
B. Start Service; Stop Service; Install Meter; Remove Meter; Exchange Meter; Move-In/Move-Out Service
C. Enable Service; Disable Service; Install Meter; Remove Meter; Exchange Meter; Back-to-Back Service
D. Enable Service; Disable Service; Cut for Non-Payment; Reconnect Service for Payment; Exchange Meter; Back-to-Back Service
For a customer to receive a Subscription communication, what must they have?
A. an active address contact preference
B. an active address type preference
C. an active person contact preference
D. an active account contact preference
Within the application, operational devices can be assets or components.
Which two statements are true about components? (Choose two.)
A. Components are attached to assets.
B. Components have a disposition that tracks their location and status.
C. Components can be installed at locations.
D. Components are not a class of assets.
E. Components can't have specifications.
Which major entities hold the key geographic, demographic, and financial information related to a customer who is financially responsible for a property?
A. Account, Bill, Customer Class, Premise, Service Agreement
B. Account, Bill, Premise, Service Agreement, Service Port
C. Account, Person, Premise, Service Agreement, Service Port
D. Account, Customer Class, Person, Premise, Service Agreement E. Account, Customer Class, Premise, Service Agreement, Service Port
New: An electric utility is starting an Advanced Meter Infrastructure (AMI) roll-out for their residential customers. The initial plan is to roll out devices from their manufacturer with potentially three different device models. The customer has not decided what head-end systems they will use to communicate with these devices. Based on the customer's initial roll-out strategy, the devices will have to be configured consistently to support existing tariffs for billing.
Which is a valid consideration to determine the setup of device type administrative data for this implementation?
A. billing usage rules
B. the model number
C. the device's date of manufacturer
D. valid head-end systems, valid device configuration types, and the electricity service type
Which three are important Account concepts that must always be followed? (Choose three.)
A. Accounts expire when there are no active contracts.
B. An Account can only reference one and only one person at one time.
C. Every Account has a unique, system-assigned Account ID.
D. Bills are produced for an account and are sent to the account persons.
E. An Account references one or more persons.
Which option correctly describes the high-level process from loading measurements through calculating usage?
A. 1. Load Initial Measurements
2.
Validate, edit, and estimate Initial Measurements
3.
Create Final Measurements
4.
Update Initial Measurements
B. 1. Load Initial Measurements
2.
Verify, evaluate, and enter Initial Measurements
3.
Create Final Measurements
4.
Calculate Usage
C. 1. Load Initial Measurements
2.
Validate, evaluate, and estimate Initial Measurements
3.
Update Initial Measurements
4.
Calculate Usage
D. 1. Load Initial Measurements
2.
Validate, edit, and estimate Initial Measurements
3.
Create Final Measurements
4.
Calculate Usage
At what stage in the initial measurement data (IMD) import process will the application of meter multipliers be performed?
A. Critical Validation
B. VEE
C. Prepare for VEE
D. post-VEE